![](https://www.vertechgroup.com.au/wp-content/uploads/PA160002-500x375.jpg)
![Beach Energy Otway 2020 Turnaround Planning & Execution. Beach Energy Otway 2020 Turnaround Planning & Execution.](https://www.vertechgroup.com.au/wp-content/uploads/RDVI-scaled-1-500x375.jpeg)
Projects
![](https://www.vertechgroup.com.au/wp-content/uploads/PA160002-500x375.jpg)
![](https://www.vertechgroup.com.au/wp-content/uploads/20240810_070437-500x231.jpg)
Koolan Island Bridge: A Collaboration Success Story
![](https://www.vertechgroup.com.au/wp-content/uploads/IMG_3947-500x374.png)
Parker Point Jetty – CVI & NDT Inspection Campaign
![A high-tech, industrial piece of equipment, the i-COT is a remotely operated ballast tank inspection device with the words "SONOMATIC GEO OCEANS" printed on the side. It has a robust, dark frame with yellow and orange components, wires, and cylindrical parts, indicative of sophisticated marine technology. The device rests on a shelf indoors, and a cable is connected to it, extending off the right side of the frame. A high-tech, industrial piece of equipment, the i-COT is a remotely operated ballast tank inspection device with the words "SONOMATIC GEO OCEANS" printed on the side. It has a robust, dark frame with yellow and orange components, wires, and cylindrical parts, indicative of sophisticated marine technology. The device rests on a shelf indoors, and a cable is connected to it, extending off the right side of the frame.](https://www.vertechgroup.com.au/wp-content/uploads/i-COT-3-500x281.jpg)
i-COT – Successful mapping condition of FPSO crude oil/water ballast shared boundaries
![A worker in an orange high-visibility suit climbs a flare support structure against a clear blue sky. The structure is painted orange, matching the worker's attire, and is equipped with safety railings and platforms. The worker is secured with safety harnesses and ropes, indicating adherence to strict safety protocols. The photograph is taken from ground level, looking up and emphasising the structure's height and scale within the expansive sky's expansive backdrop. A worker in an orange high-visibility suit climbs a flare support structure against a clear blue sky. The structure is painted orange, matching the worker's attire, and is equipped with safety railings and platforms. The worker is secured with safety harnesses and ropes, indicating adherence to strict safety protocols. The photograph is taken from ground level, looking up and emphasising the structure's height and scale within the expansive sky's expansive backdrop.](https://www.vertechgroup.com.au/wp-content/uploads/P9010100-500x375.jpg)
NRA Guy Wire Replacement
![The image is a 3D rendering showing the detailed understructure of an offshore platform. The focus is on the corroded metal beams and pillars that form the substructure, with the textures and colouration suggesting advanced stages of rust and material degradation. Above, the platform’s deck is visible, providing a sharp contrast to the worn conditions of the support elements below. The perspective offers a clear view of the engineering complexity and maintenance challenges faced in the harsh marine environment. The visualisation technique provides clarity and depth, highlighting areas of concern for structural integrity assessments. The image is a 3D rendering showing the detailed understructure of an offshore platform. The focus is on the corroded metal beams and pillars that form the substructure, with the textures and colouration suggesting advanced stages of rust and material degradation. Above, the platform’s deck is visible, providing a sharp contrast to the worn conditions of the support elements below. The perspective offers a clear view of the engineering complexity and maintenance challenges faced in the harsh marine environment. The visualisation technique provides clarity and depth, highlighting areas of concern for structural integrity assessments.](https://www.vertechgroup.com.au/wp-content/uploads/Picture2-1-500x244.png)
3D Jetty Inspection using aerial and ground-based Photogrammetry
![A vast, flat expanse of arid land stretches into the distance, marked by a straight, unsealed road cutting through the landscape. Parallel to the road runs a large metal pipeline, supported intermittently by wooden blocks. A white utility vehicle is parked beside the pipeline, its presence minuscule in the vastness of the terrain. The environment is characterised by red soil, sparse green shrubbery, and a wide horizon under a partly cloudy sky, evoking a sense of remote industrial activity in a desert-like setting. A vast, flat expanse of arid land stretches into the distance, marked by a straight, unsealed road cutting through the landscape. Parallel to the road runs a large metal pipeline, supported intermittently by wooden blocks. A white utility vehicle is parked beside the pipeline, its presence minuscule in the vastness of the terrain. The environment is characterised by red soil, sparse green shrubbery, and a wide horizon under a partly cloudy sky, evoking a sense of remote industrial activity in a desert-like setting.](https://www.vertechgroup.com.au/wp-content/uploads/received_1855694121481296-500x375.jpeg)
Moomba to Cross Border CCS Pipeline
![Engineered decking systems deployed on the underside of a jetty Engineered decking systems deployed on the underside of a jetty](https://www.vertechgroup.com.au/wp-content/uploads/P1120007-min-500x375.jpg)
CPF Riser Protection Netting
![A three-person IRATA Rope access trades team is replacing the INPEX FPSO flare. A three-person IRATA Rope access trades team is replacing the INPEX FPSO flare.](https://www.vertechgroup.com.au/wp-content/uploads/P7070657-min-500x375.jpg)
Ichthys Venturer FPSO Flare Tip Replacement
![A rope access AICIP inspector is conducting a pressure piping inspection on an LNG asset. A rope access AICIP inspector is conducting a pressure piping inspection on an LNG asset.](https://www.vertechgroup.com.au/wp-content/uploads/Main-Image-min-500x333.jpg)
LNG Core Pressure Equipment Inspection
![The top of a fuel tanker overlooks desert scenery in the background. The top of a fuel tanker overlooks desert scenery in the background.](https://www.vertechgroup.com.au/wp-content/uploads/Project-4-5-min-500x375.jpg)
Tank Inspection IOR – Eromanga, Far West QLD
![A group of IRATA Rope Access Technicians posing for a group photo in front of a helicopter used to deliver meshing to the rock face. A group of IRATA Rope Access Technicians posing for a group photo in front of a helicopter used to deliver meshing to the rock face.](https://www.vertechgroup.com.au/wp-content/uploads/IMG_8697-min-500x357.jpg)
Koolan Island Helicopter Meshing Campaign
![A tank at the Zinc Refinery with a yellow pipe coming out of the left-hand side with a large rust mark running down the centre of it. A tank at the Zinc Refinery with a yellow pipe coming out of the left-hand side with a large rust mark running down the centre of it.](https://www.vertechgroup.com.au/wp-content/uploads/Project-2-1-min-375x500.jpg)
Shutdown Inspections Townsville, QLD
![A large yellow cylindrical piece of refinery equipment covered in scaffolding. A large yellow cylindrical piece of refinery equipment covered in scaffolding.](https://www.vertechgroup.com.au/wp-content/uploads/Project-1-3-min-375x500.jpg)
Tank Inspection Zinc Refinery Townsville, QLD
![Engineered decking systems deployed on the underside of a jetty Engineered decking systems deployed on the underside of a jetty](https://www.vertechgroup.com.au/wp-content/uploads/GLNG-Tension-Netting-398x500.png)
Gladstone LNG Jetty Tension Netting
![The underside of the Ichthys venturer FPSO. The underside of the Ichthys venturer FPSO.](https://www.vertechgroup.com.au/wp-content/uploads/HULL-2021-02605-MINI-ROV-STBD-HOSE-INS-HULL-MNPL-STBD-HULL-HULL-FWRS-MNPL-STBD-006-500x281.jpg)
Ichthys Venturer FPSO ROV UWILD
![DSL Jetty Decking Case Study DSL Jetty Decking Case Study](https://www.vertechgroup.com.au/wp-content/uploads/DSL-Jetty-Decking-500x291.png)
DSL Jetty Alternative Access
![Tension netting installed offshore to access conductors for inspection and repair. Tension netting installed offshore to access conductors for inspection and repair.](https://www.vertechgroup.com.au/wp-content/uploads/P2200034-500x375.jpg)
Conductor Integrity Tension Netting
![A Remote crawler system being deployed as part of an internal visual inspection (IVI) removinG the requirement for manned confined space inspection A Remote crawler system being deployed as part of an internal visual inspection (IVI) removinG the requirement for manned confined space inspection](https://www.vertechgroup.com.au/wp-content/uploads/PB130061-500x375.jpg)
Beach Energy Turnaround 2021 & 2022
![INPEX ICTHYS 2021 Turnaround Planning & Executions. INPEX ICTHYS 2021 Turnaround Planning & Executions.](https://www.vertechgroup.com.au/wp-content/uploads/P1090269-2-500x375.jpeg)
INPEX Ichthys 2021 Turnaround Planning & Executions
![An IRATA NDT and Marine class inspector conducting tank inspections and an ELIOS unmanned aerial vehicle (UAV) supporting at-height class inspection An IRATA NDT and Marine class inspector conducting tank inspections and an ELIOS unmanned aerial vehicle (UAV) supporting at-height class inspection](https://www.vertechgroup.com.au/wp-content/uploads/Marine-Class-500x334.jpg)
UAV Cargo Tank Inspection
![An image taken on inpex LNG during a major shutdown and turnaround project in Darwin, NT An image taken on inpex LNG during a major shutdown and turnaround project in Darwin, NT](https://www.vertechgroup.com.au/wp-content/uploads/ILNG-scaled-500x375.jpg)
ILNG, CPF & FPSO Turnaround & Shutdown
![Santos GLNG 219 & 2021 Shutdown completing RVI and rdvi Inspection of pressure vessels Santos GLNG 219 & 2021 Shutdown completing RVI and rdvi Inspection of pressure vessels](https://www.vertechgroup.com.au/wp-content/uploads/Beach-Energy-1-scaled-1-500x375.jpeg)
Santos GLNG 2019 & 2021 SD
![Barossa & Scarborough Feed Reviews. Barossa & Scarborough Feed Reviews.](https://www.vertechgroup.com.au/wp-content/uploads/Woodside-2-scaled-1-500x375.jpeg)
Barossa & Scarborough Feed Reviews
![A Marine loading arm being lifted as part of a LNG facility MLA replacement project. A Marine loading arm being lifted as part of a LNG facility MLA replacement project.](https://www.vertechgroup.com.au/wp-content/uploads/marine-loading-arm-replacement-project-500x500.jpg)
Marine Loading Arm (MLA) Maintenance & Replacement
![A helicopter approaching the NRA Flare boom to install the new Flare tip as part of a V-FLARE package for woodside energy A helicopter approaching the NRA Flare boom to install the new Flare tip as part of a V-FLARE package for woodside energy](https://www.vertechgroup.com.au/wp-content/uploads/NRA-Flare-500x356.jpg)
NRC HP & LP Flare Tip Change
![An image of the old flare tip being lifting on a custom frame as part of the GWA Flare Tip Replacement campaign An image of the old flare tip being lifting on a custom frame as part of the GWA Flare Tip Replacement campaign](https://www.vertechgroup.com.au/wp-content/uploads/GWA-Flare-Tip-Replacement-18-500x334.jpg)
GWA Flare Tip Change
![Woodside Burrup Peninsula shutdown with RDVI being used to inspect pressure vessels Woodside Burrup Peninsula shutdown with RDVI being used to inspect pressure vessels](https://www.vertechgroup.com.au/wp-content/uploads/P1000058-scaled-1-500x375.jpeg)
Woodside Barrup Peninsula TA
![A standoff image of a Diamond offshore Mobile offshore drilling unit (MODU) as part of lifting, NDT and Fleet wide Inspection services A standoff image of a Diamond offshore Mobile offshore drilling unit (MODU) as part of lifting, NDT and Fleet wide Inspection services](https://www.vertechgroup.com.au/wp-content/uploads/IMG_1461-500x384.jpeg)
Diamond Fleet Inspections
![A green monster pad eye tester conducting proof load testing as part of a lifting equipment inspection and recertification campaign A green monster pad eye tester conducting proof load testing as part of a lifting equipment inspection and recertification campaign](https://www.vertechgroup.com.au/wp-content/uploads/Load-Testing-5-500x375.jpg)
ICHTHYS Gas Field Development
![An IRATA multi disciplined NDT inspector conducting crane boom ultrasonic inspection and visual inspection as part of a wider lifting equipment and crane inspection campaing on an FPSO An IRATA multi disciplined NDT inspector conducting crane boom ultrasonic inspection and visual inspection as part of a wider lifting equipment and crane inspection campaing on an FPSO](https://www.vertechgroup.com.au/wp-content/uploads/P1000911-500x375.jpg)
FPSO Integrity & NDT
![A rope access technician working above water on an FPSO Riser turret mooring (RTM) offshore A rope access technician working above water on an FPSO Riser turret mooring (RTM) offshore](https://www.vertechgroup.com.au/wp-content/uploads/RTM-14-500x375.jpg)
OKHA, NGA, NY & NE Shutdowns
![An image of Vertech rope access rigggers, mechanical fitters and rope access inspectors on the Pluto lNG flare tip as part of a project. An image of Vertech rope access rigggers, mechanical fitters and rope access inspectors on the Pluto lNG flare tip as part of a project.](https://www.vertechgroup.com.au/wp-content/uploads/P1010157-1-scaled-e1686556219869-500x310.jpg)
Pluto Flare Maintenance
![An image of the Angel platform from the top of the flare boom as part of a V-LIFT Flare Tip replacement bia rope access, custom designed frames and strolley mechanisms. An image of the Angel platform from the top of the flare boom as part of a V-LIFT Flare Tip replacement bia rope access, custom designed frames and strolley mechanisms.](https://www.vertechgroup.com.au/wp-content/uploads/Angel-Flare-change-3-500x372.jpg)
Angel Flare Tip Change
![Beach Energy Otway 2020 Turnaround Planning & Execution. Beach Energy Otway 2020 Turnaround Planning & Execution.](https://www.vertechgroup.com.au/wp-content/uploads/RDVI-scaled-1-500x375.jpeg)
Beach Energy Otway 2020 Turnaround Planning & Execution
![The mobile radiography team in the Copper Basconducting pipeline radiography. The mobile radiography team in the Copper Basconducting pipeline radiography.](https://www.vertechgroup.com.au/wp-content/uploads/copper-basin-project-500x375.jpg)
Cooper Basin Pipelines
![Ballera South West QLD pipeline inspection project package. Ballera South West QLD pipeline inspection project package.](https://www.vertechgroup.com.au/wp-content/uploads/ballera-south-west-qld-project-500x375.jpg)
Ballera – South West QLD
![The team of Multi-disciplined NDT, rope access and lifting equipment inspectors onboard a diamond Offshore semi sub drill rig The team of Multi-disciplined NDT, rope access and lifting equipment inspectors onboard a diamond Offshore semi sub drill rig](https://www.vertechgroup.com.au/wp-content/uploads/semisub-lifting-management-project-500x375.jpg)
Offshore Drilling – SEMI SUB Management
![A vertech multidisciplinary mechanical, API and multi NDT inspection team conducting crane inspections on an FPSO pedestal crane A vertech multidisciplinary mechanical, API and multi NDT inspection team conducting crane inspections on an FPSO pedestal crane](https://www.vertechgroup.com.au/wp-content/uploads/fpso-platform-crane-inspection-project-500x375.jpg)
FPSO & Platform Crane Inspection
![A Marine class accredited inspection with a mini ROV of an FPSO Ballast Tank on an offshore FPSO. A Marine class accredited inspection with a mini ROV of an FPSO Ballast Tank on an offshore FPSO.](https://www.vertechgroup.com.au/wp-content/uploads/rov-ballast-tank-inspeciton-project-500x256.jpg)
ROV Ballast Tank Inspection
![HTHA Sonomatic Shutdown. HTHA Sonomatic Shutdown.](https://www.vertechgroup.com.au/wp-content/uploads/HTHA-Sonomatic-Shutdown-1-e1642226948682.png)
HTHA Shutdown
![The Inpex FPSO in south korea while under construction. The vertech personnel were conducting baseline inspection, NDT and class services which continued into operations. The Inpex FPSO in south korea while under construction. The vertech personnel were conducting baseline inspection, NDT and class services which continued into operations.](https://www.vertechgroup.com.au/wp-content/uploads/offshore-asset-construction-baseline-project-500x375.jpg)
Offshore Asset Construction Baseline
![An image of the Marine piping within a FPSO's tanks being replaced and repaired by vertech rope access tradesmen An image of the Marine piping within a FPSO's tanks being replaced and repaired by vertech rope access tradesmen](https://www.vertechgroup.com.au/wp-content/uploads/marine-piping-fab-maintenance-project-500x375.jpg)
Marine Piping, Fabric & Maintenance
![A rope access technician working above the water on an FPSO Riser turret mooring (RTM) offshore A rope access technician working above the water on an FPSO Riser turret mooring (RTM) offshore](https://www.vertechgroup.com.au/wp-content/uploads/rtm-decommisioning-project-500x375.jpg)
RTM Decommissioning
![RDVI technicians on an LNG facility conducting Hydrocarbon atmosphere inspections using specialist systems and tooling RDVI technicians on an LNG facility conducting Hydrocarbon atmosphere inspections using specialist systems and tooling](https://www.vertechgroup.com.au/wp-content/uploads/hydrocarbon-atmoshpere-inspection-project-500x375.jpg)
Hydrocarbon Atmosphere Inspections
![A rope access technician during the Gladstone LNG shutdown project. A rope access technician during the Gladstone LNG shutdown project.](https://www.vertechgroup.com.au/wp-content/uploads/gladstone-lng-shutdown-project-500x375.jpg)
Gladstone LNG Shutdown
![IRATA rope access technicians, Electricians, mechanical fitters and NDT inspectors delivering the GWA Derrick decommissioning project. IRATA rope access technicians, Electricians, mechanical fitters and NDT inspectors delivering the GWA Derrick decommissioning project.](https://www.vertechgroup.com.au/wp-content/uploads/gwa-derrick-decommisioning-500x375.jpg)
GWA Derrick Decommissioning
![A view from the to of the Goodwyn Alpha (GWA) offshore production platform during the GWA flare remediation project. A view from the to of the Goodwyn Alpha (GWA) offshore production platform during the GWA flare remediation project.](https://www.vertechgroup.com.au/wp-content/uploads/gwa-flare-remediation-500x375.jpg)
GWA Flare Structure Remediation
![An image of the The Inpex FPSO on station off Australia. An image of the The Inpex FPSO on station off Australia.](https://www.vertechgroup.com.au/wp-content/uploads/inpex-fpso-project-500x334.jpg)
CPF & FSPO Inspection
![A few of the Rope access trades team on the greenfield phase of INPEX LNG construction support project. A few of the Rope access trades team on the greenfield phase of INPEX LNG construction support project.](https://www.vertechgroup.com.au/wp-content/uploads/inpex-lng-construction-support-project-500x375.jpg)
INPEX LNG Plant Construction & Support
![KGP shutdown project. KGP shutdown project.](https://www.vertechgroup.com.au/wp-content/uploads/kgp-shutdown-project-500x375.jpg)
KGP Shutdown
![An IRATA rope access team using a deck system as a work position platform on the KGP Birth 3 project. An IRATA rope access team using a deck system as a work position platform on the KGP Birth 3 project.](https://www.vertechgroup.com.au/wp-content/uploads/kgp-birth-3-project-500x375.jpg)
KGP LNG Berth 1 & 3 Inspection Campaigns
![A rope access Marine class inspector conducting a Special Survey 8 inspection as part of a class inspection cycle on an offshore FPSO A rope access Marine class inspector conducting a Special Survey 8 inspection as part of a class inspection cycle on an offshore FPSO](https://www.vertechgroup.com.au/wp-content/uploads/special-survey-7-project-500x375.jpg)
Special Survey No. 8
![Pulsed Eddy Current Inspection Pulsed Eddy Current Inspection](https://www.vertechgroup.com.au/wp-content/uploads/PEC-Inspection-500x375.jpg)
Pilbara Port Corrosion Mapping
![Image courtesy of Woodside of the Pluto LNG facility where vertech conducted baseline NDT, AICIP visual and structural inspections Image courtesy of Woodside of the Pluto LNG facility where vertech conducted baseline NDT, AICIP visual and structural inspections](https://www.vertechgroup.com.au/wp-content/uploads/pluto-baseline-inspection-project-500x333.jpg)
Pluto LNG Baseline Inspection
![An image from Woodside Energy of one of the Offshore FPSO's vertech managed the inspection, NDT, Marine class and specialist maintenance over a five-year term. An image from Woodside Energy of one of the Offshore FPSO's vertech managed the inspection, NDT, Marine class and specialist maintenance over a five-year term.](https://www.vertechgroup.com.au/wp-content/uploads/woodside-fpso-fleet-project-500x335.jpeg)
Woodside FPSO Fleet Inspections
![The Woodside North Rankin Alpha platform illustrating the derrick structure being decommissioned by Vertech rope access tradesman The Woodside North Rankin Alpha platform illustrating the derrick structure being decommissioned by Vertech rope access tradesman](https://www.vertechgroup.com.au/wp-content/uploads/NRA-Derrick-Decon-4-9-14-4147-500x333.jpg)
North Rankin Derrick Decommissioning
![The Okha FPSO RTM project where vertech provided rope access, confined space entry, conventional and advanced NDT inspection, as well as project management and wrap repairs as part of a life extension project The Okha FPSO RTM project where vertech provided rope access, confined space entry, conventional and advanced NDT inspection, as well as project management and wrap repairs as part of a life extension project](https://www.vertechgroup.com.au/wp-content/uploads/rtm-life-extension-project-500x375.jpg)
RTM Life Extension Project
![An image of the Nganhurra FPSO which vertech supported the disconnect and tow away for Woodside Energy. . An image of the Nganhurra FPSO which vertech supported the disconnect and tow away for Woodside Energy. .](https://www.vertechgroup.com.au/wp-content/uploads/nganhurra-fpso-disconnect-project-500x375.jpg)
Nganhurra FPSO Disconnect
![An image of vertech marine class inspectors conducting hull surveys, structural surveys, NDT and other inspections as part of a Decommissioning planning project for an FPSO An image of vertech marine class inspectors conducting hull surveys, structural surveys, NDT and other inspections as part of a Decommissioning planning project for an FPSO](https://www.vertechgroup.com.au/wp-content/uploads/ne-fpso-decommisioning-planning-project-500x375.jpg)
NE FPSO Decommissioning Planning
![An IRATA rope access NDT inspector abseiling as part of the Goodwyn Alpha (GWA) Turnaround An IRATA rope access NDT inspector abseiling as part of the Goodwyn Alpha (GWA) Turnaround](https://www.vertechgroup.com.au/wp-content/uploads/GWA--500x375.jpg)
GWA Turnaround
![Remote digital visual inspection and robotic inspection of pressure vessels during the GLNG turnaround. Remote digital visual inspection and robotic inspection of pressure vessels during the GLNG turnaround.](https://www.vertechgroup.com.au/wp-content/uploads/glng-turnaround-project-500x500.jpg)
GLNG Turnaround
![The chervil fixed platform topsides being lifted off by a crane as part of a Decommissioning project The chervil fixed platform topsides being lifted off by a crane as part of a Decommissioning project](https://www.vertechgroup.com.au/wp-content/uploads/chevril-project-500x375.jpg)
Chevril Platform Decommissioning
![A vertech API crane inspector conducting rope access inspection on an offshore pedestal mounted crane A vertech API crane inspector conducting rope access inspection on an offshore pedestal mounted crane](https://www.vertechgroup.com.au/wp-content/uploads/offshore-crane-maintenace-project-500x375.jpg)
Offshore Crane Integrity
![One of the barges supporting the Gorgon LNG build from a speedboat after full lifting and lifted equipment inspections had been completed One of the barges supporting the Gorgon LNG build from a speedboat after full lifting and lifted equipment inspections had been completed](https://www.vertechgroup.com.au/wp-content/uploads/lng-inspection-management-project-500x375.jpg)
LNG Inspection & Management
![A picture of the Vertech rope access trades and Rope access NDT personnel during the Gorgon LNG construction project on Barrow island A picture of the Vertech rope access trades and Rope access NDT personnel during the Gorgon LNG construction project on Barrow island](https://www.vertechgroup.com.au/wp-content/uploads/gorgon-wheatstone-construction-project-500x306.jpg)
Gorgon & Wheatstone LNG Plant Construction
![A vertech rope access team constructing a flare on Corpus Christi LNG in the USA A vertech rope access team constructing a flare on Corpus Christi LNG in the USA](https://www.vertechgroup.com.au/wp-content/uploads/usa-lng-flare-build-project-500x375.jpg)