Sonomatic were engaged to provide advanced NDT, tube inspection and integrity engineering services during the Karratha Gas Plant shutdown. In total, Sonomatic provided 12 tube inspectors, 4 senior tube analysts, 4 advanced NDT inspectors and 2 integrity engineers.

KGP Shutdown
Sonomatic were able to provide quick inspection results and integrity recommendations leading to a successful turnaround.
Speak to Vertech Group about Your Next Project
"*" indicates required fields
