Vertech project case study.

Nganhurra FPSO Disconnect

Vertech provided multi-disciplined marine class inspectors, NDT inspectors and lifting engineers to confirm the integrity of critical structures required for the disconnect and tow.

Simultaneously, over multiple campaigns, our maintenance and IRATA rope access personnel (including mechanical fitters, EEHA inspectors and riggers) prepared the asset for the FPSO disconnect and ultimate decommissioning phase.

Speak to Vertech Group about Your Next Project