An image of the Nganhurra FPSO which vertech supported the disconnect and tow away for Woodside Energy. .

Nganhurra FPSO Disconnect

Vertech provided multi-disciplined marine class inspectors, NDT inspectors and lifting engineers to confirm the integrity of critical structures required for the disconnect and tow. Simultaneously, over multiple campaigns, our maintenance and IRATA rope access trades personnel (prepared the asset for the FPSO disconnect and decommissioning phase.

Vertech personnel successfully and safely supported the integrity and inspection work to allow engineering assessment and to meet all compliance requirements. Our high-mobility rope access tradesman supported numerous tasks, including the removal of some tertiary steelwork, the removal of some ancillary equipment, and some strengthening work, which ultimately led to the safe tow away out of Australian waters.

Services Provided:

A rope Access, AICIP & NDT inspector, conducting compliance inspections to AS 3788 on an FPSO.
  • Project management
  • Work pack development
  • Rescue and Confined space planning
  • Inspection & Marine Engineering support
  • Integrated activity planning
  • Accredited Marine Class Inspection
  • Multi-Disciplined NDT Technicians
  • Rope Access Mechanical Fitters
  • Rope Access Lifting Equipment Engineers
  • Provision of all NDT Equipment
  • Provision of all access & rescue equipment
  • Provision of trades tooling

Speak to Vertech Group about Your Next Project