Bechtel engaged Vertech’s USA team to erect the flare tower structure and mount a flare tip at the Corpus Christi LNG plant in Texas, USA. The structure was assembled successfully using IRATA rope access techniques and multi-skilled specialist maintenance personnel.
![A vertech rope access team constructing a flare on Corpus Christi LNG in the USA A vertech rope access team constructing a flare on Corpus Christi LNG in the USA](https://www.vertechgroup.com.au/wp-content/uploads/usa-lng-flare-build-project-500x375.jpg)
USA LNG Flare Build
The scope included pipe and mechanical fitting, steel erection, cold cutting, welding, complex structural rigging, electrical and cabling works, and coating touch-ups. The project was a success and illustrated that experienced, high-mobility IRATA trades teams could save significant costs and achieve significant safety benefits.
Speak to Vertech Group about Your Next Project
"*" indicates required fields
![A vertech technician is carrying out testing on top of a flare. A vertech technician is carrying out testing on top of a flare.](https://www.vertechgroup.com.au/wp-content/uploads/USA-LNG-FLARE-BUILD-5-min-500x375.jpg)