KGP shutdown project.

KGP Shutdown

During the Karratha Gas Plant shutdown, Sonomatic provided advanced NDT, tube inspection, and integrity engineering services. Sonomatic provided twelve tube inspectors, four senior tube analysts, four advanced NDT inspectors, and two integrity engineers.

Sonomatic provided quick inspection results and integrity recommendations, leading to a successful turnaround.

Speak to Vertech Group about Your Next Project

"*" indicates required fields

The Vertech KGP Team stops and poses for a photo during the shutdown.